| http://www.w3.org/ns/prov#value | - However, pre-construction site work such as electrical line upgrades, site remediation, excavations and existing equipment relocations are needed to prepare for the installation of new equipment that include selective catalytic reduction, electrostatic precipitator, semi-dry scrubber, baghouses, and new stack (exhaust/ventilation).3/7/14: MassDEP entered into a Consent Order with Safdie Architects
|