| http://www.w3.org/ns/prov#value | - It said the cause of the breach was unknown, pointing out that the dam was an independently engineered structure that operated within design limits and specifications. ???Monitoring instruments and on-site personnel had no indication of an impending breach,??? the company said in a statemen
|