| http://www.w3.org/ns/prov#value | - The method includes the steps of: interconnecting a cementing tool in the tubular string, the cementing tool including a valve for selectively permitting cement flow between an interior of the tubular string and the wellbore external to the tubular string, and a packer for sealingly engaging between the cementing tool and the wellbore; radially outwardly expanding the cementing tool, thereby enlar
|