PropertyValue
http://www.w3.org/1999/02/22-rdf-syntax-ns#type
http://www.w3.org/ns/prov#value
  • The closing of the different circuits can be established in such a manner as to effect successive operations, according to the sequence of operations chosen, following the example of FIG. 5 in the following order: (1) Opening of the e-lectro-gate 7 for admission of air and, at the same time, opening of the electro-gate 23 for the feeding of gasoline from the first injector 24. (2) Closing of elect
http://www.w3.org/ns/prov#wasQuotedFrom
  • google.com