| http://www.w3.org/ns/prov#value | - The explanation until now relates to operation planning in response to power demand which varies from time to time in the operation and maintenance plan preparation aiding system for a power generation installation, however, other than the above, the present operation and maintenance plan preparation aiding system for a power generation installation also prepares a long term operational plan.
|