| http://www.w3.org/ns/prov#value | - FIG. 1 is a timing chart for explaining a case where a master station 901 conducts information communications with each of a plurality of slave stations (in this example, a slave station A 902, a slave station B 903, a slave station C 904, and a slave station D 905).
|