| http://www.w3.org/ns/prov#value | - The PD was an attachment to the RFP and identified over 100 mandatory requirements for such things as materials, design and construction, performance, verification, and packaging of the RACM. With regard to the technical proposal requirements, the RFP required ??[t]he following information [to] be provided [which] will be evaluated to determine acceptability in accordance with Section M-900?? and
|