through some of the long holes; recovering the recovery solution the resource body through long holes which are not being used as injection long holes; and conducting the injection and recovery of the recovery solution in such a manner as to maintain the hydrostatic pressure of the outer periphery of the resource body and to control the hydrostatic pressure of that portion of the resource body bei