barrier studies; collect, assimilate, and present data in reports, memos and public forums; lead production of design calculations and technical reports; and lead preparation of engineering plans and specifications for design of fish barriers, stream restoration, detention facilities, storm drains, flood control facilities, and other hydraulic structures.