ng bars and through the narrowest areas of the mold.??? Two general rules are that the maximum size should be no more than 3/4 the size of the space between the reinforcing bars, and 1/5 of the smallest form dimension.??? Finally, it should be noted that as the maximum aggregate size increases, the size and robustness of the mixers, pumps, and other equipment needed to make and place the concrete