In addition to the other BMPs control measures [ considered required by Part III B 4 ], the following BMPs measures shall be considered: routing storm water to the treatment works; or covering exposed materials (i.e., from the following areas: grit, screenings, and other solids handling, storage, or disposal areas; sludge drying beds; dried sludge piles; compost piles; septage or hauled waste rece