Article 3, point 5 of the bill states that the device is: placed under the ground, on the ground or above the ground drainage lines, technical equipment and facilities to supply or discharge of electricity, natural gases, including carbon dioxide, heat, oil and petroleum products, water, sewage collection and fluids necessary for the construction and operation of underground non-tank storage syst