| prov:value
| - The employer shall have in writing evidence that such a survey has been performed. (b) When employees are required to work within a structure to be demolished which has been damaged by fire, flood, explosion, or other cause, the walls or floor shall be shored or braced. (c) All electric, gas, water, steam, sewer, and other service lines shall be shut off, capped, or otherwise controlled, outside t
|