The honeycomb structure 21 is placed on the mask 40 and the cells to be filled are aligned with the bores 45 by some suitable means such as by inserting heavy wire or rods down several of those cells and moving the structure 21 across the upper surface 43 of the plate 40 until the wires or rods register with the bores 45.