the remaining space is filled by pouring in a medium such as cement or cement/lime mixture. 8PowerPoint Presentation: Once the drums are filled to 75% capacity, the mixture of lime, cement and water in the proportions 15:15:5 (by weight) is added and the drum filled to capacity.