PropertyValue
http://www.w3.org/1999/02/22-rdf-syntax-ns#type
http://www.w3.org/ns/prov#value
  • o minimize technical, cost, and schedule risk as early as practicable in the development of the project or program. ???(2) TEST AND EVALUATION STRATEGY- The master plan shall-- ???(A) set forth an integrated test and evaluation strategy that will verify that capability-level or asset-level and subsystem-level design and development, including performance and supportability, have been sufficiently
http://www.w3.org/ns/prov#wasQuotedFrom
  • govtrack.us