| http://www.w3.org/ns/prov#value | - Ifthis is the direction then the contingency plan needs to be developed and the risk must bemonitored.Avoidance: Because a change is made to the project, such as revising the scope to eliminate therisk, no Risk Response Plan needs to be developed.
|