| http://www.w3.org/ns/prov#value | - These newly proposed actions were not previously analyzed in the Final EIS/EIR and involve additional demolition activities, substantial excavation and grading, installation of a geohazard soil stabilization system, structural upgrade to remaining structures, and other site alterations.
|