PropertyValue
http://www.w3.org/1999/02/22-rdf-syntax-ns#type
http://www.w3.org/ns/prov#value
  • Hence, when a plurality of jobs can be spooled, succeeding spooled jobs can be sequentially processed at the timing of the lapse of the assigned time-out time if the error in the preceding job is a cause peculiar to the interrupted job.
http://www.w3.org/ns/prov#wasQuotedFrom
  • google.fr