PropertyValue
http://www.w3.org/1999/02/22-rdf-syntax-ns#type
http://www.w3.org/ns/prov#value
  • In step 45, the system 70 generates an MPSR matrix seen in FIG. 7 to integrate the master production schedule report (MPSR) with the quantity of wafers from the WIP quantity data within deliverable Cycle Time (CTn where n is a positive integer).
http://www.w3.org/ns/prov#wasQuotedFrom
  • google.com