| http://www.w3.org/ns/prov#value | - 13) Wasted labor costs due to non-productive time???This is the cost of labor for the hour(s) of non-productive time, such as the time it takes to transport the worker between buildings if he has jobs on his work schedule for more than one building at the location.
|