PropertyValue
http://www.w3.org/1999/02/22-rdf-syntax-ns#type
http://www.w3.org/ns/prov#value
  • A sealing test can optionally be carried out even at this stage, for example by provisional closure of the first connecting part and pressing off, for example using helium gas, for example from the other side of the machine.After completion of the inspection and, if appropriate, after reworking of the solder points, the second connecting part 2b is now placed onto the first connecting part 2a, in
http://www.w3.org/ns/prov#wasQuotedFrom
  • archpatent.com