  • Others such as operating reserves are required to provide reserve capabilities to help sustain the power system in the event of a major system disturbance or the loss of critical facilities.Avoided Cost-Avoided cost is the incremental cost to an electric utility of new generation or transmission capacity, or both, which the utility avoids through conservation or the purchase of power from another