PropertyValue
http://www.w3.org/1999/02/22-rdf-syntax-ns#type
http://www.w3.org/ns/prov#value
  • The AASHTO Guide Specification((33) requires 3-day curing for pavements and 7 days for structures, including bridge decks.
http://www.w3.org/ns/prov#wasQuotedFrom
  • dot.gov