http://www.w3.org/ns/prov#value | - Because the fluid communication path may allow mud or other drilling fluid to pass through the spearhead assembly 200 in a substantially unimpeded manner, the communication path may allow the spearhead assembly 200 and the connected downhole object to travel at greater speeds up and down the borehole (or drill string).
|