| http://www.w3.org/ns/prov#value | - The plan shall include a description of the potential pollutant sources from the following activities, as applicable: grit, screenings, and other solids handling, storage, or disposal areas; sludge drying beds; dried sludge piles; compost piles; septage or hauled waste receiving station; and access roads/rail roads and rail lines. 2.
|