| http://www.w3.org/ns/prov#value | - In the 50 minutes after the earthquake before the tsunami arrived, there were all sorts of issues in their Unit 1 that shouldn???t have been issues, including loss of instrumentation, loss of power to control systems and reactor temperatures ramping up and down at three times the safe rate.
|