PropertyValue
http://www.w3.org/1999/02/22-rdf-syntax-ns#type
http://www.w3.org/ns/prov#value
  • As chief engineer, Baran will be responsible for directing all inspection, maintenance, repair, planning and capital works for all MBTA right-of-way track, moveable and fixed-span bridges, culverts and drainage structures, signal systems, stations, buildings, facilities and other infrastructure.
http://www.w3.org/ns/prov#wasQuotedFrom
  • masstransitmag.com