| http://www.w3.org/ns/prov#value | - Durability issues for PT tendons in the United States came to the forefront in 1999 when bridge engineers became aware of failures that resulted from grout voids, associated bleed water, and tendon strand corrosion at higher elevations, such as at anchorages and crest areas.
|