| http://www.w3.org/ns/prov#value | - Specifically, R. Baker & Son was tasked with the dismantlement and selective demolition of two (2) - 300 foot towers, a 160 feet tall x 16 feet diameter column, heat exchangers, tanks, boilers, cooling tower, rail loading equipment and other vessels, pumps and associated piping and steel work.
|