| http://www.w3.org/ns/prov#value | - Commentators also suggested other additional investigation and mitigation measures that operators should be required to take, including a field survey, the collection of gas or water, or both, samples, the establishment of monitoring locations, and an evaluation of the operator's adjacent wells.
|