PropertyValue
http://www.w3.org/1999/02/22-rdf-syntax-ns#type
http://www.w3.org/ns/prov#value
  • The MMSD designation followed three years of negotiation, public hearings and meetings to determine if the system and its major sewer interceptor would be built.The Ryan Creek Interceptor is a gravity-based system being built along Ryan Creek south of the intersection of 60th Street and Ryan Road to South 76th Street.
http://www.w3.org/ns/prov#wasQuotedFrom
  • franklinnow.com