PropertyValue
http://www.w3.org/1999/02/22-rdf-syntax-ns#type
http://www.w3.org/ns/prov#value
  • The project involves the dredging of 900,000 cubic metres of material and the construction of over 1 kilometre of vertical wave-absorbing seawalls, ferry piers, a railway overrun tunnel, a dual three-lane road tunnel, a heliport, precast cooling water pumping stations and pipelines as well as drainage and other works.
http://www.w3.org/ns/prov#wasQuotedFrom
  • leightonasia.com