| http://www.w3.org/ns/prov#value | - The APD includes two key components: (1) the drilling plan,which describes the plan for drilling, casing, and cementing the well; and(2) the surface use plan of operations, which describes surfacedisturbances, such as road construction to the well pad and installation ofany needed pipelines or other infrastructure.
|