PropertyValue
http://www.w3.org/1999/02/22-rdf-syntax-ns#type
http://www.w3.org/ns/prov#value
  • Compared to the standard and revised method the difference of the ABC costing method stems mainly from allocating differently the engineering, packaging and shipping costs as well as the receiving and handling costs.
http://www.w3.org/ns/prov#wasQuotedFrom
  • caseforest.com