| http://www.w3.org/ns/prov#value | - The answer may still be Yes", if you want to go to the trouble and expense of paving the three block easement to county standards, and if you want to grade a flat pad on the slope, and if you want to drill a well, and if a perc test proves that the soil is suitable for a septic system!
|