| http://www.w3.org/ns/prov#value | - If the abandoning railroad, in conveying a corridor to the interim trail manager, wishes to ensure that bridges, tunnels and other structures remain in place for possible future rail service, the railroad should include specific provisions relating to these structures in the instruments of conveyance.
|