http://www.w3.org/ns/prov#value | - The following is a list of the proposed changes to the project: Redesign the facility to replace the approved turbines and once-through cooling system with a R2C2 design and dry-cooling, changing the nominal plant capacity from 630 MW to 560 MW;
|