| http://www.w3.org/ns/prov#value | - Because TVA as a non-public utility cannot file a transmission rate at the Commission for unauthorized flows.and because the costs of such flows will occur as a result of a Commission-ordered interconnection, we believe cost recovery should be permitted through [the Interconnection Agreement between EKPC and TVA] rather than TVA having to go to another forum to seek recovery, the Commission said
|