| http://www.w3.org/ns/prov#value | - After the first well bore 14 has been cleaned out, production flow or other production characteristic may be tested by collecting, monitoring and/or measuring water, gas, and other fluids produced from the coal seam 12 through the first configuration of the first well bore 14.
|