PropertyValue
http://www.w3.org/1999/02/22-rdf-syntax-ns#type
http://www.w3.org/ns/prov#value
  • After the first well bore 14 has been cleaned out, production flow or other production characteristic may be tested by collecting, monitoring and/or measuring water, gas, and other fluids produced from the coal seam 12 through the first configuration of the first well bore 14.
http://www.w3.org/ns/prov#wasQuotedFrom
  • google.com