| http://www.w3.org/ns/prov#value | - But if you say let's not do this project, if you want to get transit out to Oakland, say, by doing down the old CSX rails, or up Fifth Avenue, it is going to be a tremendous amount of lead time.Q - Tolling Route 80- We look at it, assuming about 8 toll plazas, with maintenance and equipment, assuming major upgrades, especially on the eastern 1/3 of the system, the analysis showed the cost to be ver
|