| http://www.w3.org/ns/prov#value | - This helps train the worker 200 to load the catalyst properly, and, if there is a bridging or other problem, the catalyst can be removed and the filling can be restarted at an early stage, as soon as the problem is detected, rather than waiting until the tube is completely filled and fails a test.
|