PropertyValue
http://www.w3.org/1999/02/22-rdf-syntax-ns#type
http://www.w3.org/ns/prov#value
  • Referring to FIG. 24, during the manufacture of the initial stacks 200, the back pressure otherwise provided by a plurality of completed stacks within choke passageway 272 may be provided by plug 288, which may be made of plastic, wood or other suitable material.
http://www.w3.org/ns/prov#wasQuotedFrom
  • google.ca