http://www.w3.org/ns/prov#value | - Mitigation measures include: temporary covering canvas shall be prepared for construction materials such as asphalt, oil and chemicals; necessary measures shall be adopted to prevent earth and scattered construction materials from blocking existing municipal pipe network; build simple drainage facility before construction of roadbed slope, and dig trapezoidal drainage ditch outside slope angle of
|