PropertyValue
http://www.w3.org/1999/02/22-rdf-syntax-ns#type
http://www.w3.org/ns/prov#value
  • Engineers listed flood fighting implications for a scaled-down project as: - Fully modifying flood walls, closure structures, pump stations and other structures might not be possible in the time frame of a flood fight. - Suitable material to raise more than eight miles of levees might be difficult to find and deliver to needed locations on short notice. - During a dry cycle, the public perception
http://www.w3.org/ns/prov#wasQuotedFrom
  • minotdailynews.com