| http://www.w3.org/ns/prov#value | - In addition to the provisions of subsections (g)(1) and (2) of this section, the following engineering controls and work practices and procedures shall be used.(A) All Class I work, including the installation and operation of the control system shall be supervised by a qualified person as defined in subsection (b) of this section;(B) For all Class I jobs involving the removal of more than 25 linea
|