PropertyValue
http://www.w3.org/1999/02/22-rdf-syntax-ns#type
http://www.w3.org/ns/prov#value
  • intained in proper working order and inspected for deficiencies, such as cracks, missing valves, and gaskets. (d) Procedural requirements. (1) When performing the initial positive or negative pressure test, the sampling line must be crimped closed in order to avoid air pressure leakage during either of these tests. (2) In order to reduce the amount of QNFT time, an abbreviated screening isoamyl ac
http://www.w3.org/ns/prov#wasQuotedFrom
  • ecfr.gov