| http://www.w3.org/ns/prov#value | - ive means for accomplishing the utility adjustment, such work is to be done under competitive bid contracts as described in ??645.115(a) (1) and (2) or under an existing continuing contract provided it can be demonstrated this is the most cost-effective method.(c) Costs for labor, materials, equipment, and other services furnished by the utility shall be billed by the utility directly to the TD. T
|