| http://www.w3.org/ns/prov#value | - In a further embodiment for a production facility, there is an underlying operating plan that has some production or output objective, e.g., achieving a production or output level for a defined period, for example, in a process where the resource is used for heating to a high temperature or cooling to a low temperature, or pumping, grinding, compressing, metal plating or other work that consumes t
|