| http://www.w3.org/ns/prov#value | - Encroachments, including, but not limited to, fill, new construction, substantial improvements, and other development, are prohibited, unless a registered professional engineer certifies that the proposed encroachment into the regulatory floodway shall not result in any rise in the BFE using hydrological and hydraulic analysis performed in accordance with City of Bellevue Storm and Surface Water E
|